22nd October 1922:
Portsmouth/Ryde Ferry Service

22nd October 1922:
Portsmouth/Ryde Ferry Service
Duchess of Fife (1899 – 1929).

On Sunday 22nd October 1922 there were five round trips offered between Portsmouth and Ryde with each of the sailings inward and outward bound also calling at Southsea’s Clarence Pier..

Portsmouth/Ryde Timetable October 1922.

First away from Portsmouth was at 10.15am with subsequent departures at 12.20pm, 2.10pm, 4pm and 6.55pm. First departure from Ryde was at 11.10am and the last at 9.25pm.

Princess Margaret (1893 – 1928).

The Portsmouth/Ryde route required five paddle steamers in the peak weeks and particularly for summer Saturdays: Duchess of Norfolk, Duchess of Fife, Duchess of Kent, Duchess of Albany and Princess Margaret. In winter there was a need for just two on weekdays and on Sundays only one although a second was held in reserve and in steam in case of necessity.

Come November the 10.15am sailing was dropped making the first departure for Ryde from Portsmouth at 12.20pm.

Duchess of Kent (1897 – 1937).

The steamers operated as two-class vessels, with first-class passengers accommodated aft and second-class passengers forward. In 1922, the first-class return fare between Portsmouth and Ryde Pier Gates was 4s (equivalent to £11.45 today), while the second-class return fare was 3s 2d (£9.20). By comparison, Wightlink’s current foot passenger fares between Portsmouth Harbour and Ryde Pier Head are £22.40 single, £29.20 day return and £40.40 period return. Even allowing for inflation, travel on the route today is approximately two-and-a-half to four times more expensive than it was in 1922, depending on the class of ticket and type of return fare used for comparison.

The weather in Portsmouth on Sunday 22 October 1922 was chilly, settled and unusually dry, with a persistent area of high pressure over southern England. Temperatures hovered around 10°C to 12°C, and much of southern England had experienced rainfall around 24% below normal for the month. Conditions changed abruptly at the end of October, when a colder northerly outbreak brought widespread and unusually early snowfall to many parts of the United Kingdom.

Kingswear Castle returned to service in 2026 after the second part of a major rebuild which is designed to set her up for the next 25 years. The Paddle Steamer Kingswear Castle Trust is now fund raising for future rebuilds. You can read more and how you can possibly help here.

John Megoran

John Megoran

This article was first published on 22nd October 2020.